Construction · 01 / 05
Site preparation
The plot is cleared and graded, with the site camp, laydown yard and access roads in place before construction starts.
Transport and clearance, installation and site construction.

Construction · 01 / 05
The plot is cleared and graded, with the site camp, laydown yard and access roads in place before construction starts.
The plot is cleared and graded, with the site camp, laydown yard and access roads in place before construction starts.
Foundations are set out to the plot plan and cast, then pipe-rack bays and structural steel are erected.
Columns, vessels and modules are lifted onto their foundations to engineered lift plans, in a planned sequence.
Process piping, utilities and platforms connect every area to the pipe rack.
Each area is checked and completed, and the facility is ready for commissioning.
What we do

01
Equipment and modules are shipped, cleared through customs and delivered to site.

02
Lift planning and heavy lifts for columns, vessels and modules.

03
Modules are hooked up and the supporting plant is built around them where it is in SPEC’s scope: pipe racks and interconnections, roads and drainage, control rooms and buildings, substations and power distribution.
How we deliver
Welding and testing to qualified procedures, with each area checked and completed.
Mechanical completion is handed to commissioning system by system, ready for pre-commissioning.
Projects
Projects where SPEC carried out construction.

14,400 BPSD · Kirkuk, Iraq

2 × 8,500 BPSD · Najaf, Iraq

30 MMSCFD · Mehar, Pakistan

6,500 BPSD · Sulaymaniyah, Iraq

3,200 BPSD · Kurdistan Region, Iraq

8,500 BPSD · Arbat, Sulaymaniyah, Iraq